No Title
cv: 7750 bekijken ------------------------------<-<- pagina terug
  • Reageer per email
  • Bel voor bemiddeling
  • Naar alle CV's



Electrical Lead Designer

in overleg
passend werk



Qualifications: Autocad, and windows experience
Languages : Dutch, English, Germans, Turkish


EXPERIENCE:
APR. '07 - PRESENT: AKER-KVAERNER E&C B.V.
(Electrical Lead Designer)
Responsible for electrical installation on reffinery.
Client : Statoil (Mongstad refinery)

AUG. '06 - APR. '07: GUSTOMSC B.V.
(Electrical senior Designer)
Responsible for electrical installation on ship.
Client : Exxon (FPSO Mondo)

JAN. '06 - JUL. '06: AKER-KVAERNER E&C B.V.
(Electrical senior Designer)
Responsible for estimate and basic engineering package.
Client : Teijin Twaron (spinning line L1,L2,L3 Emmen)

DEC. '04 - JAN. '06: INFRASPEED (Siemens, Fluor, Bam consortium)
(Electrical Lead Designer)
Responsible for electrical installation in tunnel and technical buildings
On high speed line, Amsterdam Belgium border.
Client : HSL line (Dutch state)

NOV. '03 - DEC.-'04: AJS (Amec, Jacobs, Stork consurtium)
(Electrical Designer)
Responsible for general revamp work on platforms.
Client : Onegas (Shell / Nam)

SEP. '02 - OKT.-'03: JGC-DE (DORDTSE ENG.)
(Electrical Designer)
Responsible for general revamp work.
Client : Du-pont Dordrecht (Power plant)

OKT. '01 - JUL'02 : IV- OIL & GAS.
(Electrical Designer)
Responsible for detail design heat-tracing installation on platform
Client : VEBA Oel (Hanze Fa2 platform)

APR. '00 - OKT-'01: KVAERNER E&C B.V.
(Electrical Designer)
Responsible for estimate and detail design for revamp work on site
Client : KERR-McGEE Rozenburg
From okt. '00 - okt. '01
Responsible for interface between existing and new plant BDO-2
detail design drafting on AutoCAD.
Client : LYONDELL (ARCO) Botlek
From apr. '00 - okt. '00

OKT. '98 - APR. '00: FLUOR DANIEL E&C B.V.
(Electrical Designer)
Client : LYONDELL (ARCO) Botlek
LYONDELL (ARCO) in Belgium (Rieme)

JAN. '98 - OKT. '98: JGC-DE (DORDTSE ENG.)
(Electrical Designer)
Client : ICI (Variant vision II)

JUN. '97 - DEC. '97: FLUOR DANIEL E&C B.V.
(E & I Designer)
Client : DUPONT DORDRECHT LYCRA

APR. '96 - MAY. '97: JOHN BROWN E&C B.V
(Electrical Designer)
Client : BPM (Bredase Polystreen Mij) Fabr. IV

AUG. '95 - APR. '96: RAYTHEON E&C B.V.
(Electrical Designer)
Client : AKZO NOBEL

SEP. '94 - JAN. '95: BADGER E&C B.V
(Electrical Designer/cad operator)
Client : SHELL THAILAND

DEC. '92 - JUL. '93: FLUOR DANIEL E&C B.V
(E & I Designer/cad operator)
Client : DUPONT DORDRECHT LYCRA

AUG.'91 - DEC. '92: JOHN BROWN E&C B.V
(E Designer/cad operator)
Client : DSM GELEEN (IMD/SMA Building)

SEP.'90 - JUL. '91: FLUOR DANIEL E&C B.V
(E & I Designer/cad operator) Client : GENERAL ELECTRIC (GEP-ABS A-dam)

SEP.'89 - JUL. '90: JOHN BROWN E&C B.V
(E Designer/cad operator)
Client : ETHYL (FELUY Belgium)

JAN.'89 - JUL. '89: FLUOR DANIEL E&C B.V
(E & I Designer/cad operator) Client : DSM GELEEN (PPF-2 plant)

DEC.'88 - JAN. '89: ELECTROBOUW E&C B.V
(E Designer/cad operator) Client : GEM.GORINCHEM CARIBABAD

MAR.'88 - DEC. '88: JOHN BROWN E&C B.V
(E Designer/cad operator)
Client : GE BPA-II PLANT (Bergen op zoom)

JUN.'87 - MAR. '88: GLOBAL ENGINEERING B.V
(E Designer/cad operator)
Client : PLACID, MOBIL, PETROLAND, PENNZOIL

DEC.'86 - MAY. '87: SPEM TRANSPORT TECHNIEK
(E Designer/cad operator)
Client : EUROMAX ROERMOND ALIMINIUM fabr.

OCT.'86 - DEC. '86: IBN ENGINEERING B.V.
(E Designer/cad operator)
Client : SHELL (Pernis), Schiphol project

JUL.'86 - OKT. '86: MATHEW HALL KEYNES B.V. (MHK)
(E Designer/cad operator)
Client : SHELL (Pernis)

MAR.'86 - JUL. '86: JOHN BROWN E&C B.V.
(E Designer/cad operator)
Client : ARAMCO (Rastanura)

SEP.'85 - MAR. '86: GLOBAL ENGINEERING
(E Designer/cad operator)
Client : PETROLAND, UNION OIL AND MOBIL