www.
TechnischPersoneel.com
rechtstreeks inhuren van zelfstandig werkend personeel
No Title
cv:
7706
bekijken
------------------------------
<-<- pagina terug
Reageer per email
Bel voor bemiddeling
Naar alle CV's
Tweeten
Functie:
field designer
Woonplaats:
Beschikbaar:
in overleg
Zoekt:
passend werk
Website:
Opleiding:
Vakkennis:
Ervaring:
Qualifications : LTS-E Technical College
MTS-E Technical College
HPS Technicum
General Experience
Involved in coordination instrument design-packages part at office and site location.
Responsible for a draftsman/AutoCAD operator drawing packages in coordination
with the Lead Engineer.
General Experience
Dec.2003 - Present: Controlec Engineering, Schiedam
Instrument field designer
Client: Odfjell Terminals Rotterdam
Project:
CCR PID
The existing control room CCR PID will be replace for a new control room at another location.
Scope of work
To check electrical instrument connections of Unit-2, 5 and 6
Field activities
To secure of instrument:
control room layout
front and rear panel layout
location layouts
fire and gas layouts
cable layouts
field junctionboxes
crossboards
wiring diagram auxiliary/relay cabinets
Field activities
To secure of electrical:
lighting layouts
earthing layouts
power layouts
mcc connection diagrams
heattracing junction box layout
terminal diagrams
power and lighting distribution boards
Client: Nam Gaag II Maassluis
Site location Nam: Prepair all instrument drawings on site for as built.
Jun.2002 - Nov.2003: Lurgi Construction, Dusseldorf
Essent (EPZ) Power plant location
Instrument field designer
Client: Essent (EPZ)
Project:
HVG / Amer 9
Hout Vergassing
For detail engineering
Support Lurgi engineering/construction site office team
for revamp of HVG / Amer 9 building.
Field activities
To secure of:
co/co2 meassurement
analyser meassurement
multi core/single cables route
junctionbox rack
flow, pressure and temperature transmitters
The convoy with meachanic with the villain work.
Design activities
Design of instrument:
data sheets
co/co2 connection diagrams
co/co2 location layouts
location layouts
field junction boxes
loop diagrams
hook ups
cable list
mdf cabinet
package unit drawings
prepair as built drawings
Design activities
Design of electrical:
lighting layouts
earthing layouts
electrical layouts
mcc equipment layout
mcc connection diagrams
mcc data/equipment list
heattracing junction box layout
heattracing connection diagrams
prepair as built drawings
Feb.2001 - Jun.2002: GTI Rotterdam Industrie b.v.
Shell location
Instrument field Designer
Client: Shell
Project:
F&U Metering
Feedstock and Utility Metering
For detail engineering
To place new adjustable flow meters with appurtenances
pressure and temperature transmitters which connected to
a flow computer cabinet.
Field activities
To secure of:
flow computer cabinet
multi core cable route
junction box rack
flow, pressure and temperature transmitters
The convoy with mechanic with the villain work.
Design activities
Design of instrument:
block diagrams
layout of electrical instruments
cable layouts
field junction boxes
cable layout control and auxiliary room
cable list
mdf cabinets
loop diagrams
connection diagram flow computer cabinet
Sep.2000 - Feb.2001: Kvaerner, Zoetemeer
Instrument Designer
Client; Dow Europe
Pre-pair demolition drawings;
Instrument block diagram, - layouts, - cable schedule,
-cable schedule, - loop diagram
Design and update;
New situation: block diagrams, - instrument layouts, - junction
boxes, - instrument room layout, - i/o cross board racks, -
instrument cable schedule, - instrument loop diagrams,
- mounting details, - air piping details, - process piping and
installation details
Feb.2000 - Aug.2000: Lyondell Chemical, Rozenburg
Instrument Designer
Client; Lyondell
Design and update; Instrument field layouts, - junction boxes,
cable layouts, - equipment layouts, - block diagrams, -
termination layout relay cabinet, - digital cross board wiring, -
cable list, - start/stop and trip signals from irc cabinet to mcc
compartment, - trip and annunciator alarms, - loop diagrams
Nov.1999 - Jan.2000: K-H Amec Engineering, Amsterdam
Instrument Designer
Client; DWR
To built in a ups battery for back-up plc systems and watch
dog (voltage guarding) power failure for 15 drain consort .
Design and update;
Low voltae single line diagram, instrument main current scheme
operating, PLC feeder/operating and measurement, existing
arrangement cabinets, - switch cupboard, - terminal strip,
Writing scope of works & field check at location for 15 drain consort.
Sept.1999 - Nov.1999: Controlec Engineering, Schiedam
Instrument Designer
Client; Kemira Pigments & DSM Brocades
Design and update;
Instrument field junction boxes, - marshalling cabinets; - loop
diagrams,- field layouts, - block diagrams,
update instrument data and process list.
Apr.1999 - Sept.1999: Stork E & C, Rotterdam
Instrument Designer
Client; Dow Terneuzen,
Emergo Revamp Furnance LHC-2 & LHC-3
Responsible for complete design packages of new drawings:
Instrument block diagrams furnaces LHC-3 vfdp,
- vfdp connection diagrams, - location layouts, - air supply
manifold layouts, - air supply manifold take off, - details
Update instrument line and data list LHC-2.
Aug.1998 - Mar.1999: ABB Lummus Global, The Hague
Instrument Designer
Client; Essar Oil Refinary, India
Responsible for complete design packages of new drawings:
Instrument field cabling layouts, - cable tray layouts, - field
junction boxes, - field location layouts, - equipment layout
satellite building, - cable list.
Check and mark-up vendor drawings for design of
instrument layouts.
May 1998 - Aug.1998: Stork E & C, Schiedam
Instrument Designer
Client; Mahardi Upgrade Project, Al Furat
Design packages of existing and new drawings:
Existing and new instrument block diagrams.
Instrument cable layouts, - field junction boxes, - loop diagrams,
- process piping details, - mounting details, - demolition drawings.
Jan.1998 - May 1998: K-H Amec Engineering, Schiedam
Instrument Designer
Client; Suiker Unie Revamp
Design packages of existing and new drawings:
Instrument field location layouts, - cable layouts, - field location
junction boxes, - junction boxes, - connection diagram signal and
operator panels, - connection diagram graphic panels, - connection
diagram marshalling cabinets, - block diagrams new and existing.
Jun.1996 - Dec.1997: John Brown, Zoetemeer
Instrument Designer
Client; Shell Revamp CC2/GP3&New plant Splitter/Treater
Design packages of existing and new drawings:
Instrument field cable layouts, - field junction boxes, - field
process connection layouts, - field cable tray layouts, cable list
Design work ISS - Building (Aux. Room)
Existing and new instrument cable layout, - mdf cabinets, - block
diagrams, - loop diagrams, -instrument supply board.
Field check at location and 5 month involved the work at the
construction site Shell Pernis.
Jan.1996 - Jun.1996: Controlec Engineering, Schiedam
Instrument Designer
Client; Akzo & Kemira Pigments
Design packages of existing drawings:
Instrument electric cable layouts, - equipment layouts, - field
junction boxes, -existing and new instrument loop diagrams.
Electrical design works:
electrical power, lighting and earthing layouts, - block diagram,
- connections supply to marshalling relay box, - start / stop signals
from marshalling relay box to the variable speed converter.
Jun.1995 - Jan.1996: Fluor Daniel Consultants, Bergen op Zoom
Instrument Jr. Designer / Designer
Client; Shell PER + Project Butaan (S160), H2 Hydrogen (S912)
and Flare (932)
Design packages of :
Instrument block diagram, - layout auxiliary and control room,
- supply board, - cable layout control and auxiliary room,
- field junction boxes, - mdf cabinets, - loop diagrams, - cable list,
- air lines and impulse lines metric.
Sept.1994 - Jun.1995: JGC Dordtse Engineering, Dordrecht
Instrument Jr. Designer
Client; Belgium Refinig Corporation, HDS-2 Modification
Demolition packages of:
Instrument block diagram, - field location layout unit 600 &
700, - loop diagrams.
Design packages of:
Instrument block diagrams, - field location layouts, - loop diagrams,
- connection diagrams.
Modification of existing data sheets and pre-pair new data sheets.
Client; Shell Chemie Pernis, CEOD / COF-3 Plot Clear Alarm
Demolition packages of existing plot clear alarm layouts.
Design packages of:
Location of loudspeakers in combine with Shell.
New plot clear alarm layouts.
Plot clear field junction boxes.
Writing plot clear alarm scope of works.
Apr.1994 - Sept.1994: Comprimo Belgie N.V. Antwerpen
Electrical Designer/sr.designer
Client; Sola Shell Chemie Norway
Responsible for complete design package of power,lighting and
earthing layouts,single line diagram lighting and auxiliary
distribution board,cable trench layouts,substations equipment
layout,terminal rack interface cabinet E&I,cable routing layout
beneath substations,lighting and earthing layout substations,
mark-up all cable lists for this project.
Jun.1992 - Mar.1994: Abb Lummus Crest, Voorburg
Electrical Designer/sr.designer Electrical Designer
Client; Petrogal Company Portugal
Responsible for complete design package of revamp work for:
Electrical power, lighting and earthing layouts.
Design demolition pakages.
Client; Elf Petroland
Responsible for complete design package:
Electrical power, lighting and earthing layouts, - blockdiagrams,
- connection diagrams, - arrangement panels for mcc, battery
and generator room, - heattracing isometric.
Design demolition pakages.
Client; NAM
Responsible for complete design pakage:
Electrical lighting, earthing, power layouts for plant and miscellaneous buildings.
All main and sub junction boxes, cable tray layouts and check
vendor workprints.
Aug. 1988 - Jun.1992: Dow Europe, Rotterdam
Electrical Designer
Client; Dow Projects
Design lighting, power, earthing layouts, circuit and terminal connection
diagram, ligthing main and sub-junction boxes, communication block
diagrams, lighting calqulation for substations; cable tray, earthing and
lighting layout substation
Design demolition pakages.
Jan. 1988 - Aug. 1988: Controlec B.V. Schiedam
Electrical Designer
Client; Shell Chemie
Writing requisition for electric motors,switches,low and high voltage cables.
10 and 25% job calculation of Azodrin production installation,replace steam
turbine to electric motors.
Writing scope of work job calculation.
Design lighting,power,earthing and trench layouts.
May 1987 - Jan. 1988: Matthew Hall Keynes, Schiedam
Electrical Designer
Client; Parenco paper factory
Commissioning of PM1 , TMP line A and B
Visual test:
Check instruments and motors according to instrument and motor
list to determine manufacture and type.
- for correctness of instrument,motor and switch installation.
- cable installation (cable glands and tensions relief installation)
- if installation in accordance with NEN requirements.
- for presence and correctness of nameplates.
Report any deviation on test report.
Comissioning/DRY TEST
Check if cables/wires are installedon correct terminals and modify any mistakes.
- if main switch is in " 0 " position.
- if fuses in main circuit are correct.
- if thermal setting is set right,if not correct adjust in accordance with the id-tag.
- if electric motor is mechanically uncouppled from the driver.
- if entire installation is technically sound.
- all instrument and motor signals from terminal rack to input/output of plc.
WET TEST
This was done in cooperation with the project group of Parenco.
The starting up and commission of the first individual groups of PM1,TMP A and B.
This included correcting all problems,which presented themselves during start up and operation.
Also shift work was performed as a troubleshooter together with the Parenco operators.
May 1985 - May 1987: Siemens Nederland N.V. The Hague
Electrical Designer
Client; GEB Rotterdam Electricity Power Plant Maasvlake 1&2
Design and drafting of circuit diagram of 4-burners of the boiler
solenoid valve drive,pressuer valve,hardware cabinets,contents of these cabinets such as: sae terminal arrangements,power ditribution of the prints,apparatus list,power distribution in the power supply test cabinets,marshalling-supply cabinets.
Field works: 9 months
This work entailed the verification of:
Arrangement drawings for distribution cabinets,instrument arrangement of distribution cabinets,instrument location according to PID and instrument layout,connection diagrams,
checking of cables,cable connections of distribution cabinets and instruments,preparation of as built drawings of cable trays and cable layouts.
Sept. 1984 - May 1985: Badger B.V. The Hague
Electrical designer
Client; Conoco Oil Company
Design and drafting of platform lighting,power,earthing layouts. piperack lighting layouts,trench layout, power and earthing layout control house and substation.
Exchanger structure and pump skid lighting,power and earthing layouy.
Feb. 1984 - Sept. 1984: Fluor Ned. B.V. Haarlem
Electrical designer
Client; Esso Flexicoker
Design and drafting of lighting layout for finfan air coolers, heaters vacuum structures,pump area's and also for power, earthing and trench layouts.
Lighting panel schedules and all revamp works for area 32,33,35
Sept. 1984 - Feb. 1984: Protech International B.V. Schiedam
Electrical designer
Client; NAM
Design and drafting of earthing,power,lighting and instrument layouts for protection platform " Ameland Westgat "
Feb. 1983 - Aug. 1983: Gota Verken Arendal
Gotenburg Sweden
Electrical designer
Client; Britisch Oil Company
Design and drafting for Gotmodul works:
Lighting and small power, P.A.,entertainment,telephone and
tv system for all levels in the livingquarters (offshore).
Testloop diagram for fire dampers and fire & gas system,
electrical heating and ventilation,normal and essential distribution board.
Punch all the cables and electrical equipment in each modules.
Field works:
Checking all the cables connection in the junctionboxes for normal and essential lighting,fire & gas,fire dampers,heating and ventilation,cables in the mcc board (switch room).
Checking all motor connection,equipment,cables and connection in the junctionboxes,panels in the plantroom,galley,cold store chiller.
Punching transit cables for all levels.
Marking all drawings for as built.
Oct. 1982 - Jan. 1983: Kellog Continental, Amsterdam
Electrical designer
Client; Shell Refenery Australia
Design and drafting of lighting,earthing,power and cable tray/trench layouts.
Lighting sections and elevations cable tray/trench cross-sections.
Lighting,power details and material take off.
Apr. 1982 - Sept. 1982: Holec West Projects, Gouda
Electrical jr.designer/designer
Client; Holec West Projects
Design and drafting motor control schematic,one line diagram, earthing layout and details,instrument layout and loopdiagrams.
Sept. 1981 - Mar. 1982: Protech International B.V. Schiedam
Electrical jr. Designer/Designer
Client; Aramco Oversea
Design and drafting of block diagram,interconnection diagram,
power,lighting and earthing layouts,elementary diagrams.
Material take off.
Apr. 1981 - Sept. 1981: John Brown, Zoetemeer
Electrical jr. Designer
Client; Amoco
Design and drafting of panel layout relay cabinet,power,lighting,
earthing and lightning layouts.
Block and elementary diagram.
Jul. 1978 - Mar. 1981: Lummus Nederland, The Hague
Electrical jr. Designer
Client; Aramco Oversea
Design and drafting of electrical power,control,lighting and grounding system.
One line and elementary diagrams.
Power,lighting and control off-sites.
Lighting piperacks and platforms material take off.
Feb. 1978 - July 1978: Stone and Webster, Rijswijk
Electrical Draftsman/Designer
Client; Aramco Oversea
Design and drafting of electrical power, lighting and grounding system.
One line and elementary diagrams.
Nov. 1977 - Jan. 1978: Matthew Hall Keynes, Schiedam
Electrical Draftsman/Designer
Client; Esso Refinery
Design and drafting of electrical power / instrument diagram
and power,lighting and grounding layouts.
Mar. 1977 - Nov. 1977: Crawford & Russel, The Hague
Electrical Draftsman/Designer
Client; ICI Chemicals
Design and drafting of lighting ,power,grounding layouts,elementary
and block diagrams.
Sept. 1972 - Feb. 1977: Matthew Hall Keynes, Schiedam
Electrical Draftsman
Client; Shell Chemical,Esso Refinery and ICI Chemical
Design and drafting of lighting ,power,grounding layouts,elementary
and block diagrams.
Curriculum Vitae:
Ik zoek mensen
informatie
inschrijven
alle CV's bekijken
Ik zoek werk
informatie
inschrijven
login eigen cv
vacatures
contact
links